After the supplier proposes a configuration replacement, first freeze the allocation and payment attachments of the affected vehicles. Parts of the original order that can still be performed remain as they are; replacement vehicles enter the shipment list only after the buyer has clearly accepted them.

Do Not Compare Only the Product Name

When discussing the Toyota Camry HEV, the powertrain type, the accessories supplied with the vehicle and the after-sales materials should be listed item by item. Similar page names do not prove that the functions are the same, nor do they show that the specific vehicle can already be supplied. The other party should submit vehicle-identification materials, state the reason for the replacement and explain which original commitments could not be met.

It is advisable for procurement to keep the original configuration attachments as a comparison baseline and to fill in, item by item, the proposed replacement content and the supporting materials for the physical vehicle. Items the supplier has not answered should be marked as pending confirmation; a blank space must not be read as continuing the old configuration. Sales then rechecks the customer's stated use, turns changes that may affect usage arrangements into a list of open questions, and after-sales checks whether the previously prepared manuals and model-specific parts still correspond.

When discussing a replacement, what the customer has accepted and what the supplier still needs to prove can be recorded separately. After the customer accepts the commercial proposal, procurement still follows up on the vehicle-identity and configuration evidence. Do not write materials not yet received into the agreement email as confirmed, and do not let sales' communication records take the place of the buyer's approval.

The Change Comparison Table Needs Both Parties' Confirmation

Change item Original agreement What the new documents should state
Vehicle version Original contract attachment New configuration and deleted items
Payment Original price and payment milestones Who bears the price difference and when it is settled
Arrival and service Original delivery timing and document scope New delivery timing, manual and parts-fit impact

The comparison table can add columns for who proposed the change, supporting attachments and affected documents. For each price difference, note the quotation source used; for delivery-timing changes, state who reconfirms them; for parts impact, point to the procurement list to be adjusted. The person consolidating the replies only organizes the answers and does not fill in conclusions on behalf of other roles.

If the buyer accepts only part of the adjustment, it is advisable to send the approved and the rejected items back separately and ask the supplier to state whether the physical vehicle can be supplied in that combination. For payments not yet made, finance rechecks the request against the updated approved scope; vehicles in the original order that are unaffected keep their own execution basis.

Let the Documents Use the Same Approval Result

After the buyer approves, the documentation officer distributes the new VIN list to the customs broker and the warehouse and collects the old version. The WCO Data Model can help understand how fields correspond; it does not replace a contract change. Colombian declarations still follow DIAN's current requirements, and the broker checks whether the replacement affects the original materials.

Re-Review Prepared Attachments with the Replacement Vehicle

Example only; the contract and the physical vehicle prevail. A VIN in the order is proposed for replacement with another configuration, and the warehouse has already prepared the items to travel with the vehicle. Warehouse staff can keep the preparation status against the original list, and after-sales writes an opinion item by item: retain, pending verification or withdraw. Items lacking a fit basis are not placed in the vehicle until the person responsible for technical confirmation replies and the loading is adjusted.

After the change is approved, the documentation officer can send the recipient a clear replacement list stating which old attachment is withdrawn and which document is currently in force. Ask the warehouse to report whether the vehicle label and physical preparation are synchronized, and the broker to report whether the declaration materials require a separate correction. At the end of the drill, trace a random current shipment entry back to the buyer-acceptance record; if it cannot be found, do not tick the change as complete.

FAQ

Can a higher configuration be used as a direct replacement?

Buyer acceptance must be obtained; adding configuration can also change the cost or local eligibility conditions.

Can confirmation be given before a VIN exists?

The commercial direction can be confirmed, but final vehicle identification should be listed as a condition before shipment.

What should be done with an invoice already issued?

The issuer corrects it under the applicable procedure; renaming it only in an internal table is not enough.

Does the parts list need to be rechecked?

Yes, especially the model-specific parts previously reserved against the old configuration.

To discuss a configuration replacement, please bring the original configuration, the proposed configuration and the order milestones not yet performed; you can reach us through the Starvia contact page or WhatsApp.

Public references: Colombia DIAN customs procedures; WCO Customs Data Model. Information checked on: 2026-09-03.