Practical guides. Export playbooks. Market reports.
Field notes from 4 years of shipping Chinese vehicles to 50+ markets — practical guides for dealers, fleet operators, and importers.

At Cartagena Port, Can a Dealer Sign an Unqualified Receipt for Scratches, Shortages or Suspected Tampering and Claim Later
Colombian port-arrival scratches and shortages cannot rely on one document; use a checklist, stop conditions and the required VIN, seal, delivery note, reservations, damage and shortage images, notice recipient and clause date.

Chile-Bolivia Transit: Custody Handover Points
For cross-border carrier handover, match the current vehicle and order records, keep missing fields open and resolve conflicts before proceeding.

Rural-Road Buyers in Paraguay Should Verify Four-Wheel Drive at Handover
For four-wheel-drive handover demonstrations, match the current vehicle and order records, keep missing fields open and resolve conflicts before proceeding.

Pre-Delivery Consistency Check of Chassis Number, Engine Number, and Documents in Argentina
For pre-delivery chassis, engine and document checks, match the current vehicle and order records, keep missing fields open and resolve conflicts before proceeding.

Kenyan Used-Car Importers Check the Eight-Year Age Limit
Kenya’s eight-year rule is based on the year of first registration. Verify that date, the year of manufacture, mileage, storage history, and import eligibility before committing to stock.

One-Key Handover for Used Cars in Argentina: Transfer Documents, Security, and Replacement Costs
Complete transfer documents do not make a key handover complete. Record every registration document, delivered key, lost-key risk, replacement quotation, and final acceptance.

EV Traction Batteries and Spare Batteries Share Road-Transport Documents in Brazil
Batteries installed in vehicles, packed in the same box as the equipment, and packaged separately are subject to different identities and documents.

Bolivia: Where Did Inland-Warehouse Damage Occur?
For cross-border cargo damage, you cannot just look at the final warehouse photos; the time of port release, SIT dispatch, MIC/DTA, seal inspection.

Build a Verifiable Port-to-Warehouse Handover Chain in Tanzania
Starting from the driver and truck predicted by the port system, the Gate-in Ticket, physical gate inspection, release time, electronic sealing event and warehouse POD should be bound to the same BL/VIN.