For the United Arab Emirates, refurbishment supervisor and independent inspector should jointly approve post-refurbishment road test; a verbal handover alone is not enough. Record VIN, work order, intake condition, and final grade, the target for post-refurbishment road test, and the approval date. Road-use conditions for the post-refurbishment road test follow the destination country's competent-authority rules, licensed body permits, and applicable contract terms. Use this related vehicle-import guide to connect the post-refurbishment road test check with the surrounding process. After the supplier submits the before-and-after photos, diagnostic measurements, work order, and disclosure, the dealer should also retain that set of photos, measurements, and the post-refurbishment road test conclusion. For a first batch or high-risk post-refurbishment road test, arrange at least 2 independent checks, and both records cite the same VIN, work order, intake condition, and final grade. Items that still fail the post-refurbishment road test should be written into the condition disclosure, with the specific remedy reflected in the price or delivery condition.