The most commonly missed item in a PDI fee review is reconfirmation after a change. If the entity, vehicle, port, or batch changes after initial materials pass, update the matrix normalized for model, configuration, Incoterms, port, and validity period as well. Reusing the old conclusion can result in identically named quotes covering different delivery scopes. Therefore, after every change, again require all unlisted costs to be marked pending rather than assumed included.
For follow-up execution, see How Can Dealers Price PHEV Inventory When Buyers Compare It With Gasoline SUVs?.

