Start the separate AC and DC charging check with connector shape and communication protocol; onboard charger and DC fast-charging capability and local home and public equipment must be confirmed in writing before the next step begins. AC determines everyday slow charging; DC determines public fast charging.

AC and DC are two different charging paths, so a single “supports fast charging” field on the vehicle cannot replace separate verification. We also have What is a practical starter inventory plan for a UAE dealer importing cars from China?. The AC/DC charging decision is ultimately governed by the local rules and written confirmations in force at the time of processing.