A mixed fleet should be divided by tasks first, and the procurement combination decided afterwards. When shifts with stable recharging and long off-site missions are mixed into one average, it is hard to see which vehicle truly fits which route.

First Describe Whether a Task Can Be Interrupted

List each task's load, stopping opportunities, return-to-base arrangements and backup-vehicle conditions. The Wuling Yangguang passenger version serves only as an information entry point for the electric version and cannot represent other powertrains; the locally achievable range, load suitability and eligibility must all be verified separately.

The task description can add who confirms the departure and return arrangements, whether the vehicle can be changed en route, and the customer's requirements for handling interruptions. The dispatcher keeps the original task description first, then asks the drivers to point out the parts that may change at short notice. Replenishment points that have not been verified are listed only as pending checks and are not put into the dependable task conditions in advance.

It is advisable to list vehicle candidates and task constraints separately. Procurement states which configuration materials have been obtained, operations staff state in which tasks they plan to trial the vehicle, and after-sales lists the contact arrangements for issues that cannot be handled on site. When a condition is missing, first decide whether to narrow the trial scope rather than using another powertrain's performance to fill in the conclusion for it.

The Allocation Sheet Records the Constraints

Task condition Confirm before the trial Watch for during the trial
Fixed return to base Available charging windows and facilities Whether charging waits affect dispatch
Uncertain return trip Energy replenishment that can be obtained Reserve after a last-minute route change
High-utilization task Backup vehicles and repair capacity Downtime and use of replacement resources

Trial records can be continued per actual dispatched task, keeping the load, the drivers and any changes to mid-route arrangements. When the dispatcher reassigns a vehicle at short notice, ask for the reason for the reassignment and the replacement vehicle, and have the driver record how far the original task had been carried out. Unfinished tasks are analyzed separately and must not be mixed with records of smooth returns into a vague "usable" conclusion.

For recharging waits, repair downtime and last-minute customer changes, it is advisable to assign a person to explain each type. Operations confirms the impact on tasks, technicians judge whether the vehicle needs checking, and procurement only consolidates the confirmed constraints. Keep these differences when comparing candidates rather than deleting abnormal shifts to obtain a uniform evaluation.

Repair Capability Also Affects Allocation

HSE points out that the capabilities required for work on electric and hybrid vehicles differ by task; routine maintenance training cannot be treated as a qualification for high-voltage work. Peruvian fleets should write the repair scope they can take on into the procurement conditions; such material does not replace local qualification and technical inspection requirements.

How to Trial Allocation When Return Arrangements Change

Example, subject to the contract and the actual vehicle. A task planned for one VIN was originally due to return to base, and the dispatcher proposed adding an off-site trip. The trial can first pause the additional arrangement, confirm the current status with the driver and check whether the original recharging and backup arrangements can still be executed. If the conditions cannot be confirmed, someone with authority reassigns the task rather than asking the driver to commit to completing it on their own.

In the review, ask what information the original plan lacked, who notified the change of task, and whether the backup conditions were truly usable. Keep tasks that have not yet been verified within the trial scope, and present both the completions and the constraints when procurement discusses them. Matters requiring professional work continue to be handled by staff with the appropriate capability; trial records are not repair authorizations.

FAQ

Should the new-energy share be decided first?

Verify task coverage first, then use the results to discuss the combination share.

Can energy consumption be compared directly on the same route?

Load, shifts and recharging records still need to be aligned; you cannot compare only the dashboard numbers.

Can a sample vehicle that completes one trip justify buying more?

Repeated tasks, abnormal shifts and maintenance take-on capability still need to be checked.

What if there is no backup vehicle?

Write the downtime impact into the trial plan, narrow the trial scope or add the resource first.

When designing a mixed-fleet procurement, you can start by providing the route tasks and the recharging conditions actually available, and contact us through the Starvia contact page or WhatsApp.

Public references: HSE safety for working on electric and hybrid vehicles. Information checked on: 2026-09-03.