For Paraguay, procurement and product-technical staff should jointly confirm AC input voltage and phase, and a verbal statement does not serve as the basis. Keep the decision on AC input voltage and phase on file together with the document version, configuration code, VIN, and destination. Acceptance conditions for AC input voltage and phase on the local grid, and the related electrical safety certification, follow the current rules of the competent authority and licensed bodies and any applicable contractual terms. The Paraguay team can use this related FAQ to check whether the purchase records and the delivery records match. Start the check from the signed specification, then verify the VIN-linked record, the voltage marking on the nameplate, and the vehicle check result item by item. If the voltage and phase do not match the documents, hold the affected VINs and settle the correction, replacement, or cancellation plan before shipment.